  1. What is the first consideration for any demolition project?

    • ASpeed of completion
    • BCost minimization
    • CHazard surveys identifying asbestos, structures, services, contamination, and structural instability
    • DEquipment availability

    Answer: Pre-demolition surveys are essential to identify hazardous materials (asbestos, lead), active utilities, structural hazards, and environmental contaminants.

  2. What is a confined space?

    • AAny small room
    • BA space not designed for occupancy with limited access and potential for hazardous atmospheres
    • CA closet or cupboard
    • DAny underground area

    Answer: Confined spaces include tanks, vaults, chambers, and enclosed areas where oxygen-deficiency or toxic atmospheres can develop. Limited entry/exit complicates rescue.

  3. What is required before entry to a permit-required confined space?

    • AJust worker consent
    • BHazard assessment, atmospheric monitoring, rescue plan, permit, and trained personnel
    • COnly equipment provision
    • DNothing special

    Answer: Permit-required confined space entry requires: completed permit, atmosphere tested and acceptable, rescue equipment and personnel prepared, and competent supervision.

  4. What are the hazards associated with asbestos in demolition?

    • AAsbestos is harmless
    • BInhalation causes mesothelioma, lung cancer, and asbestosis
    • COnly a minor irritant
    • DNo specific hazard

    Answer: Asbestos fiber inhalation causes serious lung disease. Demolition of asbestos-containing materials requires licensed contractors and specialized procedures.

  5. When should asbestos removal occur during demolition?

    • ADuring general demolition
    • BBefore any other demolition work begins
    • CAfter demolition is complete
    • DIt doesn't matter

    Answer: Asbestos must be removed and properly disposed of BEFORE general demolition commences to prevent contamination and fiber release.

  6. What is atmospheric monitoring in confined spaces testing for?

    • ATemperature and humidity only
    • BOxygen levels, toxic gases, and flammable atmospheres
    • CAirflow speed
    • DMoisture content only

    Answer: Testing checks: adequate oxygen (19.5%-23.5%), absence of toxic gases (H2S, CO, etc.), and absence of flammable atmospheres (LEL limits).

  7. What is a 'Hot Work Permit'?

    • APermission to work in warm weather
    • BAuthorization and precautions for work involving heat (welding, cutting, grinding) to prevent fires
    • CA type of training course
    • DNot required

    Answer: Hot Work Permits authorize high-temperature work and require: fire watch personnel, removal of combustibles, sprinklers/extinguishers ready, and post-work checks.

  8. What should be done with utilities before demolition begins?

    • ALeave them active for convenience
    • BDisconnect, cap, and secure all services (gas, electricity, water, drainage) per regulations
    • COnly gas needs disconnection
    • DUtilities don't matter

    Answer: All live utilities must be identified, safely disconnected, and capped to prevent fire, explosion, electrocution, and contamination during demolition.

  9. What is a confined space rescue plan?

    • AOptional procedure
    • BDocumented plan for rapid extraction of an incapacitated entrant with trained and equipped rescuers
    • CJust having a first aider on site
    • DNot necessary

    Answer: Rescue plans must document: rescue method, trained rescuers, required equipment (harnesses, lines, ventilation), and coordination with emergency services.

  10. What training is required for confined space entry personnel?

    • ANo special training needed
    • BHazard recognition, atmospheric testing, rescue procedures, emergency response, and permit use
    • COnly equipment operation
    • DGeneral safety only

    Answer: Competent personnel must understand confined space hazards, recognize atmospheric dangers, perform testing correctly, and execute rescue procedures.

  11. What is the purpose of a confined space entry permit?

    • APermits not needed
    • BAuthorize entry, confirm hazards assessed, controls implemented, and rescue available
    • COptional paperwork
    • DOnly verbal permission required

    Answer: Confined space permits document: hazard identification, atmosphere testing results, rescue plan confirmation, and authorized entrant/attendant/rescue person appointment.

  12. What pre-demolition survey must be completed before demolition starts?

    • ASurveys not required
    • BAsbestos survey mandatory; identifies asbestos-containing materials before disturbance
    • COnly visual inspection needed
    • DNo asbestos risks in construction

    Answer: Licensed asbestos survey required before demolition. Identifies ACM (asbestos-containing materials), determines encapsulation or removal requirements per regulations.