21 free practice questions with explanations

PassNova has 21 free CSCS Health & Safety practice questions on Electrical Safety, each with a clear explanation. Practise them in the browser with instant feedback — 100% free, no sign-up, on any device. Updated for 2026.

Sample questions

Electrical Safety: example questions & answers

21 worked examples with answers and explanations below. Practise them in the browser with instant feedback on every answer.

  1. What is Portable Appliance Testing (PAT)?

    • ATesting how easily equipment can be carried between work areas
    • BTesting of electrical devices for safety before use
    • CTesting of portable toilets
    • DTesting of personal audio devices

    Answer: PAT is a process of examining electrical equipment for faults that could cause hazards. It involves visual inspection and electrical testing to ensure user safety.

  2. When must an electrical circuit be isolated before work?

    • AOnly where the workers carrying out the job specifically ask for it to be isolated
    • BModern insulation and circuit breakers make isolation unnecessary on site
    • COnly where the work looks dangerous to the person carrying it out
    • DBefore working on or near live circuits or cables

    Answer: Isolation removes the energy source, preventing shocks and arcs. It is mandatory before electrical work. Appearing dangerous and worker request are insufficient; procedure must be followed.

  3. What is the risk of working near overhead power lines on a construction site?

    • AElectrocution from proximity arcs, especially with cranes or tall equipment
    • BOnly minor burns to the hands if a tool happens to brush against a conductor
    • CThe risk arises only if something on site actually touches the conductors themselves
    • DThe risk is overstated, because overhead lines are insulated along their whole length

    Answer: High-voltage overhead lines create arcs over distances (typically 3–5 metres). Cranes and boom lifts can arc without direct contact, causing electrocution. Proximity alone is dangerous.

  4. Before using an electrical power tool on a construction site, what should be checked?

    • AThe colour of the cable
    • BPAT test status, cable condition, plug integrity, and that it is appropriate for the environment (e.g., wet areas)
    • CThe user's name
    • DThe cost of the tool

    Answer: Pre-use checks must verify PAT compliance, cable damage, plug safety, and environmental suitability. Cost, colour, and user name are irrelevant to electrical safety.

  5. What is a Residual Current Device (RCD)?

    • AA testing meter
    • BA type of electrical cable
    • CA circuit breaker that prevents overloading
    • DA safety device that cuts power instantly if an earth fault is detected

    Answer: RCDs (earth leakage breakers) compare current in and out. If they differ, power is cut in milliseconds, preventing electrocution. This is different from overload breakers.

  6. Buried electrical cables can be present on construction sites. What precaution should be taken before excavation?

    • APrecautions are not necessary, as buried cables are always laid deep enough to be out of reach of hand tools and machine buckets
    • BCall the utility company to locate cables or use safe digging practices like hand-digging and cable detection
    • CStart excavating with a mechanical excavator and watch the spoil for signs of cable, stopping only once something coloured appears
    • DAssume there are no cables unless a marker post or warning tape can be seen on the surface of the ground before digging starts

    Answer: Buried cables pose electrocution and fire hazards. The duty-holder must identify cable routes via utility companies or cable detection equipment before excavation.

  7. What does 110V portable site lighting reduce compared to standard mains voltage?

    • AThe shock hazard, making it safer for temporary construction site use
    • BThe cost of running the lighting, because less electricity is drawn from the supply
    • CThe brightness of the lamps, so that glare is reduced for people working nearby
    • DThe length of cable that can be run before a transformer has to be fitted

    Answer: 110V is a lower voltage standard for construction sites. It reduces shock severity if contact occurs, making it safer than 230V mains voltage, especially in wet conditions.

  8. An electrical fault is discovered on a site, such as a damaged cable. Who should be notified and what should happen?

    • AIgnore it and continue work
    • BNobody needs telling until the end of the shift, when it can be mentioned to the supervisor
    • CThe supervisor; the equipment should be isolated, labelled, and removed from service
    • DThe worker who found it should tape over the damage themselves and carry on using the equipment

    Answer: Faulty equipment must be isolated immediately (tagged 'Do Not Use') and removed from service. Continued use, attempted repair, and delayed reporting all create electrocution hazards.

  9. Under UK law, who is responsible for ensuring that electrical equipment on a construction site is safe?

    • AThe equipment manufacturer alone, because safety is designed and built into the product before it is sold
    • BThe worker using the equipment
    • CThe employer (duty-holder), who must ensure safe provision, maintenance, and use
    • DThe HSE

    Answer: HSWA 1974 and the Electricity at Work Regulations 1989 place duty on employers to provide safe equipment, maintain it, and ensure competent use. Manufacturers and workers support this but cannot substitute.

  10. What should be done if a worker receives an electrical shock on site?

    • ADisconnect the power source, call emergency services (999), and provide first aid if trained
    • BAssume the worker is unharmed if they are still conscious and able to talk, and let them carry on working
    • CLeave them to recover alone
    • DPull the worker away from the equipment by hand straight away, before doing anything else at all

    Answer: Immediate action: disconnect power, call 999, administer CPR/first aid if trained, and keep the person warm. Never assume shock effects are absent; internal injuries are possible.

  11. What is the primary purpose of an RCD (Residual Current Device) on a construction site electrical system?

    • ATo save on electricity costs by cutting the supply to the site distribution board whenever no tools are drawing power from it, so nothing is left energised overnight
    • BTo detect when a circuit is drawing more current than the cable is rated for, and to switch it off before the conductors overheat and the insulation starts to break down
    • CTo extend cable lifespan
    • DTo detect leakage current (earth leakage) and quickly disconnect the circuit, preventing electrocution if a person touches a live conductor or earth fault

    Answer: RCDs detect leakage current (as low as 30mA) and trip within milliseconds, limiting the duration and severity of electric shock. Cost savings, heat prevention, and cable lifespan are incidental. Electrocution prevention is the core function.

  12. Why is 110V reduced voltage preferred for portable electrical tools on construction sites rather than 230V mains voltage?

    • AIt delivers more power to the tool, because the transformer steps the current up as it steps the voltage down, so a 110V tool will always cut faster than the same tool run from a 230V supply
    • BIt is cheaper to install than a 230V supply, since no transformer, distribution board or special plugs and sockets are needed anywhere on the construction site at all
    • CIt removes the need for residual current devices anywhere on the site, because a reduced voltage supply cannot produce an earth fault that would trip one in any case
    • D110V reduces the severity of electric shock if contact occurs; the voltage difference between 110V and earth is lower, reducing current and heart fibrillation risk

    Answer: 110V step-down reduces shock severity compared to 230V because the voltage-to-earth is only 55V maximum. This is a risk reduction measure, not elimination. RCD protection still applies. Cost and power are secondary.

  13. Under the Electricity at Work Regulations 1989, who is responsible for ensuring that temporary electrical installations on site are safe?

    • AThe electrician only
    • BThe company that installed the building's permanent electrical system, which remains responsible for anything connected to it, including the temporary supplies run around the site during construction
    • CThe employer and any competent person designing or installing the system; regular inspection and testing must occur before use and periodically during use
    • DThe site manager alone

    Answer: EAWR 1989 places duty on the employer. Competent persons design and install; others inspect and test. The site manager oversees compliance but shares responsibility. Permanent systems are unrelated to temporary site safety.

  14. What does 'lockout/tagout' mean in construction electrical work and why is it critical?

    • ASecuring doors to the site office
    • BLocking power tools in a cupboard
    • CIsolating electrical supplies (lockout with a padlock) and labelling the isolation point (tagout with tags) before maintenance to prevent unauthorised reconnection or accidental restart, which could cause electrocution or entanglement
    • DSwitching off lights at the end of the day

    Answer: Lockout/tagout is a safety procedure for electrical and mechanical energy isolation before maintenance. It prevents accidental exposure to live electricity or moving parts. Light switching, tool storage, and door security are unrelated.

  15. What is a 'competent person' for electrical work under UK construction regulations?

    • AAn electrician with a driving license
    • BSomeone who has read an electrical manual
    • CA person with knowledge, training, and experience of electrical systems and risks; capable of identifying hazards, selecting safe systems, and recognising when specialised expertise is needed
    • DAnyone holding an electrical qualification certificate, whatever the date it was awarded and whatever the work involved, because the certificate itself is what the regulations recognise as competence

    Answer: Competency goes beyond a certificate to encompass knowledge, practical experience, and judgment. Reading manuals or holding certificates alone doesn't establish competency for complex installations. Driving licenses are unrelated.

  16. Why must construction site temporary power cables be protected from damage in high-traffic areas?

    • ATo keep the site tidy
    • BBecause damaged cables are unattractive
    • CDamaged cables expose live conductors, increasing electrocution risk; protection (casing, elevation, or barriers) prevents accidental contact or crushing that compromises insulation
    • DTo save the cost of replacing cables, which is a significant part of the site's plant budget when leads are repeatedly run over by dumpers and telehandlers in the busiest parts of the site

    Answer: Cable damage in high-traffic areas exposes live parts or crushes insulation. Protection strategies (armoured casing, cable trays, barriers) prevent damage and consequent shock risk. Aesthetics and costs are minor compared to electrocution prevention.

  17. What must be done before working on or near overhead power lines on a construction site?

    • AWear rubber gloves and rubber-soled boots before starting, since insulating personal protective equipment is what protects a worker from the voltages carried by overhead distribution lines, and no other precaution is needed
    • BAssume the lines are not live
    • COnly use non-conductive tools
    • DConfirm the line voltage, establish an exclusion zone (distance depending on voltage), notify the distribution operator if work cannot avoid the zone, and use trained spotters to maintain safe distance

    Answer: Overhead lines are assumed live; voltage determines safe distance (typically 2–6 metres depending on kV). Confirmation, zones, operator notification, and spotters are control measures. Non-conductive tools and gloves are insufficient alone; distance and awareness are primary.

  18. Under UK electrical safety regulations, what is the minimum frequency for testing and inspection of temporary site electrical installations?

    • ABefore first use and periodically (typically every 6 months for static installations, more frequently for portable equipment), with visual checks more often
    • BOnly if the HSE requests it
    • COnce per year only
    • DOnly if equipment fails

    Answer: EAWR 1989 requires testing before use and at suitable intervals thereafter. Static installations need annual PAT (Portable Appliance Testing); portable equipment needs more frequent checks. Reactive failure-based testing is unsafe and inadequate.

  19. What is 'wet location' risk in construction electrical work and how is it managed?

    • ARain falling on the work area is the only concern, so electrical work can go ahead as normal in trenches holding groundwater, in bathrooms being fitted out, or anywhere else indoors, provided the sky is clear at the time
    • BHumidity above 50% inside buildings
    • CWork in damp or wet environments (e.g., trenches with groundwater, bathrooms being fitted) where moisture increases electrocution risk; managed by using RCDs, lower voltages (110V), and moisture-resistant equipment
    • DLeaking roofs only

    Answer: Wet locations increase electrical conductivity and electrocution risk. Controls include RCDs (rapid detection), reduced voltage, and equipment designed for moisture exposure. Roof leaks and rain are examples; humidity thresholds are less critical than actual moisture.

  20. Why is earth continuity testing important for metal-cased electrical equipment on construction sites?

    • ATo satisfy aesthetic standards
    • BTo verify equipment is grounded (earth path is continuous from live circuits through the metal case to ground); a break in continuity means a fault could leave the case live, causing electrocution
    • CTo ensure the equipment weighs enough
    • DTo check the equipment's paint colour

    Answer: Continuity testing verifies the protective earth path is intact. A break means the metal case could become live if an internal fault occurs. Paint, weight, and appearance are unrelated to electrical safety; continuity directly prevents shock.

  21. What is the role of a Site Electrical Supervisor on large construction projects?

    • ATo perform all electrical installations personally
    • BTo oversee electrical installations, ensure competent persons conduct work, verify temporary systems are inspected/tested, and manage the electrical safety culture on site
    • CTo save money on electrical costs
    • DTo decide which electrical codes to follow

    Answer: The Site Electrical Supervisor ensures compliance with regulations, competent person involvement, and testing regimes. They don't perform all work but oversee. Cost savings and code selection are unrelated to supervision duties.